Manual

Version History

Version History

v1.0.0+ Admin Only

v1.11.0 (2026-10-28)

  • Added Claude Integration, which lets you work in GeckoFlag through conversations in the Claude desktop app. For details, see Claude Integration.
  • The rich text editor can now change the text color and insert horizontal lines.

v1.10.0 (2026-10-17)

  • Added support for Arabic, with a right-to-left (RTL) layout.
  • Made security fixes. For the security measures we take for GeckoFlag, see Our Approach to Security.

v1.9.0 (2026-10-11)

  • Added “Create with AI”. AI (Claude by Anthropic) proposes the contents of projects, issues, comments and wiki pages from text or screenshots (an Anthropic API key is required). For details, see Create with AI (AI-assisted input).

v1.8.0 (2026-10-09)

  • You can now attach images to issues and comments (JPEG, PNG, GIF or WebP; up to 5 MB each and up to 10 at a time).
  • The person who posted a comment and administrators can now delete it.
  • On the Kanban board, you can now change an issue's status by dragging its card (PC only). Issues whose status is “Not set” are now also shown.
  • Added a “Notify me of all comments on issues in projects I participate in” setting to the profile.
  • The personal Gantt chart now shows all issues in the projects you participate in, with assignee names. Added a “Hide completed issues” checkbox to the Gantt charts.
  • Attached images and files in the “Files” feature are now stored outside the public folder, so people who are not project members cannot open them.
  • Fixed a bug where “Change Status” in the comment area was not applied when the status or priority was “Not set”.
  • Fixed an issue where uploaded files remained on the server after a project was deleted.
  • The storage usage on the Settings screen now includes “Files” and attached images.
  • The installer's environment check now also verifies folder write permissions.

v1.7.1 (2026-10-08)

  • Added the Notes feature, where each user can freely save memos and other text. For details, see Notes.
  • Changed the emails sent for issue and comment notifications and for password resets to HTML emails.
  • Fine-tuned the UI.

v1.6.0 (2026-10-07)

  • Added the ability to bookmark individual issues. Bookmarked issues can be removed from your bookmarks at any time on the dashboard.
  • Added site-wide access restriction (by IP address) to the admin settings. For details, see Access Restriction (IP Address).

v1.5.3 (2026-10-02)

  • Added the Guest role. Users assigned the Guest role cannot add projects, so it is suited to users who only take part in specific projects.
  • Expanded the reactions available for comments to 20 in total.
  • Fixed an issue where the cache remained after updating.

v1.4.0 (2026-09-30)

  • Added support for dark mode (each user can change it from their profile page).
  • Added the ability to add reactions to comments posted on issues.

v1.3.0 (2026-09-27)

  • Added support for parent/child issues (subtasks).

v1.2.0 (2026-09-22)

  • Added German, French, Italian, Turkish, Korean, Thai, and Chinese (Simplified and Traditional) as display languages, bringing the total to 14 supported languages: English, Spanish, Portuguese, French, German, Italian, Turkish, Japanese, Korean, Chinese (Simplified and Traditional), Indonesian, Vietnamese, and Thai.
  • Made minor adjustments to the UI.

v1.1.0 (2026-09-21)

  • Added support for Indonesian and Vietnamese display languages (six languages in total: English, Japanese, Spanish, Portuguese, Indonesian, and Vietnamese).