Manual

System Requirements

System Requirements

v1.0.0+
RequirementMinimum
PHP8.2 or higher
MySQL / MariaDBMySQL 5.7+ / MariaDB 10.3+
Web serverApache or Nginx (Nginx requires additional configuration)
PHP extensionsmbstring, intl, gd, curl, zip, pdo_mysql, sodium
(From v1.10.0 onward, sodium is used to verify the signature of update files. It is included with PHP as standard and is enabled in most environments.)
Storage200MB free space (excluding uploaded files)
BrowserLatest Chrome, Firefox, Safari, or Edge

These are the same requirements as a typical WordPress installation, so most standard shared or managed hosting plans work out of the box.