Managing Client Work as a Side Job: How to Keep Projects Moving When Your Time Comes in Small Pieces
Saturday morning. You finally sit down to work on your side job. Your day job kept you busy all week, and you haven’t touched this project for a week.
But when you open the files, you can’t get going. How far did you get with the revisions last week? What was the last thing the client asked for? By the time you’ve scrolled back through email and chat to check, 30 minutes have gone by.
Remembering where you left off took longer than the work itself.
Two hours on a weekday evening, half a day on the weekend. When you do client work as a side job around your day job, your time comes in small pieces. There are also long stretches when you can’t reply right away, and projects tend to stall before you notice.
This article covers how to keep records, how to decide how much work to take on, and how to agree on contact with clients, so that your projects keep moving even when your time is broken up.
Key takeaways
- When you stop working, leave one line saying what to do next. When you come back, you can start just by reading it.
- Decide how much to take on from the hours you can actually use in a week, not from the number of weekdays.
- Tell the client at the first meeting when you can be reached and roughly how soon you’ll reply.
Note: this article is written by the developer of GeckoFlag.
Why client work on the side is hard
Even with only a few projects, side-job client work is hard in ways your day job isn’t.
- Your working time comes in small pieces: each session is short, so it’s hard to finish a piece of work in one go.
- You can’t reply right away: during your day job, you can’t answer when a client gets in touch.
- You start when you’re tired: after your day job, remembering and making decisions take extra effort.
- Gaps make you forget: even with just one or two projects, a few days between sessions is enough for things to slip out of your head.
On top of that, a side job feels the full effect of “my day job is busy this week.” You need to plan on the assumption that some weeks you won’t be able to work as planned.
None of this has to do with your skills. It’s something you can reduce by how you use your time and how you keep records.
In a side job, time is most often lost not in the middle of the work, but at the start and end of each session.
Before you stop, leave one line on what to do next
What helps most is the habit of writing one line on what to do next in the task’s comments before you stop working.
Examples
- Next: start by fixing how the form on the contact page looks. Haven’t touched the width of the input fields yet.
- The client is checking the three photos for the home page. Replace them once they reply.
If one line isn’t enough, writing these three things makes it even easier to pick up again.
- Next step: which file to start in, and where
- Waiting on: what you’re checking with the client or a collaborator
- Noticed: things that caught your eye while working but that you haven’t dealt with yet
Writing any of these takes just a minute or two right before you stop. Because you write while it’s freshest in your mind, a short note can still be accurate.
The next time you start, read this comment first. You’ll know where to begin without scrolling back through email or chat. Even when you’re tired, you can start working before you have to make any decisions.
Pay attention to task size, too. Aim for something you can finish in one session (for example, one to two hours). If you leave a big task like “Build the home page” as it is, you’ll stop halfway every time, and you’ll have to remember where you were each time.
The point of splitting tasks here isn’t to track your working time in detail. It’s because your time is broken up that you want each session to reach a good stopping point. You don’t need to log how long things take or compare them with estimates.
Decide how much to take on from the time you have
A side job gets hardest when you take on too much. Before you accept work, write down how many hours a week you can spend on your side job.
| When | Time available | Good for |
|---|---|---|
| Weekday evenings | 1–2 hours a day | Revisions, communication, small tasks |
| Weekends | Half a day to a full day | Larger pieces of production work, planning |
| Day-job lunch break | 10–20 minutes | Checking for replies, checking what to do next |
These hours are only an example. Write down what fits your own life.
Work out deadlines from the hours you can use, not from “five weekdays.” For example, if you can spend 8 hours a week on your side job, work that takes 16 hours will take two weeks. Once you allow for revisions and communication, you’ll want a bit more room than that.
If you compare the estimate with your available time and find it’s not enough, discuss the deadline or say no before you accept. You’ll lose far less trust than if you say “I won’t make it” after accepting.
SignYour plan only works if you count on two or more hours every weekday evening.
Agree with the client on when you can be reached
With a side job, there are long stretches when you can’t meet a client’s wish for a quick reply. That’s exactly why you settle this at the first meeting.
- Say when you can be reached and roughly how soon you’ll reply: be specific, for example “I check messages in the evening on weekdays and reply by the end of the next day.”
- Agree on one way to reach you when it’s urgent: so that not everything becomes urgent, also agree on when to use it.
- Set aside time to write replies all at once: for example, use the first 15 minutes of your evening session for replies. Since you don’t stop in the middle of work to reply, it’s easier to stay focused.
- Keep what you’re waiting on in tasks: write down what you’re checking with the client in the task, and look at it in your next session.
Example of what to say at the first meeting
“I’ll work on this project on weekday evenings and on weekends. I check messages in the evening on weekdays, and I usually reply by the end of the next day. If something is urgent, please email me with [Urgent] in the subject line. I’ll report on what I did over the weekend by Monday morning.”
Setting when you’ll report also works well. If you agree to report each weekend’s work on Monday morning, the client knows how things are going without asking, and you get fewer reminder messages.
If you tell them at the start, they’ll be prepared to wait even when a reply takes a little time. That’s received very differently from being late without saying anything.
RelatedHow to keep requests made by email or chat from slipping is covered in Part 3 of our beginner series, “Why Do Requests in Email and Chat Get Lost?”
RelatedHow to keep projects from stalling while you wait for client approval is covered in detail in “Keep Work Moving While You Wait for Client Approval”
Keep your day job and side job apart
When you manage side-job projects, also pay attention to the line between them and your day job.
- Check your employer’s rules first: whether you can have a side job, and under what conditions, depends on the country and the employer. Check your employer’s rules before you start.
- Don’t manage it on your day job’s devices or accounts: don’t put side-job projects on a company computer or in tools you use with a company account.
- Manage it in a separate place: manage side-job projects somewhere separate from your day job. Using a different name for the work makes it even harder to mix them up.
Even if you check side-job replies during your day-job lunch break, do it from your own device and your own account.
Keeping the information apart also protects you. If your day-job and side-job materials are in the same place, accidents can happen, such as sending day-job information to a client by mistake. And the other way around, side-job projects left in your employer’s tools can cause trouble when you change roles or leave.
Take 30 minutes at the start of the week to plan
To make the most of small pieces of time, it also helps to decide in advance how to use them. At the start of the week, take just 30 minutes to plan.
- Check how much time you have this week: look at your day-job schedule and write down how many hours you’re likely to have this week.
- Fit tasks into that time: check what’s due soon and what’s waiting for a reply, and decide what to do on which evening and on which part of the weekend.
- Look ahead to the coming weeks: look at what’s coming up and decide whether you can take on new requests.
For example, a week’s plan might look like this.
| When | What to do |
|---|---|
| Monday evening | Plan the week (30 minutes), check for replies |
| Wednesday evening | Apply revisions (one task that takes 1–2 hours) |
| Thursday evening | The day job will probably run late, so only check for replies |
| Saturday | A larger piece of production work (designing the inner pages) |
| Sunday evening | Report to the client, leave “what to do next” for the coming week |
This plan is only an example. In weeks when your day job is busy, plan for less time.
Since you don’t have to think “What should I do today?” on weekday evenings, you can get straight to work even when you’re tired.
Putting it into practice in GeckoFlag
Finally, here is how to do this in GeckoFlag.
- Put “what to do next” in a comment: at the end of each session, write “Next, start here” in the issue’s comments. When you come back, opening the issue shows you the latest comment.
- Start from the dashboard: the dashboard lists your own issues and recently updated issues. Before you start working, check today’s candidates and any issues others have updated here.
- See what’s ahead on the Gantt chart: if you give issues a start date and a due date, you can see the periods on the Gantt chart. Your personal Gantt chart shows the issues from all the projects you’re in. It’s useful for planning at the start of the week.
- Keep it on a server separate from your day job: GeckoFlag is a tool you install on a server you provide yourself. If you install it on shared hosting you rent yourself, you can manage it completely apart from your day-job environment. You manage the server yourself.
- Add collaborators when you need them: the price is a one-time $30, with no extra charge per user (the server costs extra). If more people help you in the future, you can add them as members.
If you have only one project and notes are enough, there’s no need to force a tool into your work. When projects start to overlap, or the time spent remembering starts to bother you, try how it feels in the demo. See the pricing page for the price.
RelatedKeeping admin such as invoicing and sales from slipping is covered in “Do Freelancers and Solo Business Owners Need a Project Management Tool?”
Summary
- In side-job client work, time is most often lost at the start and end of each session
- Each time you stop, leave one line on what to do next in the task’s comments. Keep tasks small enough to finish in one session
- Decide how much to take on from the hours you can use in a week, not from the number of weekdays
- Agree with the client at the start on when you can be reached and roughly how soon you’ll reply
- Keep your day job and side job apart. Check your employer’s rules for any conditions on side jobs
Even with limited time, just changing how you keep records makes projects less likely to stall. Start at the end of tonight’s session: write one line on what to do next.