What Is OpenProject? Features, Server Requirements and the Teams It Suits

Published:

What Is OpenProject? Features, Server Requirements and the Teams It Suits

OpenProject is an open-source project management tool that you can install and run on your own server. You can use it both for classic planning with a Gantt chart and for agile work with boards and sprints.

Many features are available in the free Community edition, but some are only in the paid Enterprise edition. It also needs a reasonably powerful server and someone to maintain it.

This article covers what OpenProject can do, the differences between the Community edition and the paid editions, how to install it and the server it needs, and which teams it suits and doesn’t suit.

Key takeaways

  • OpenProject is a feature-rich tool that covers work packages, a Gantt chart, boards, a wiki, meetings, and time and cost tracking.
  • The Community edition is free, and you install it on your own server. The paid Enterprise edition starts at €5.95 per user per month, with a minimum of 25 users.
  • You install it with Docker or with packages for Linux. The official guideline for up to 200 users is 4 CPU cores and 4 GB of memory. It suits teams with someone who can manage a server.

Note: this article is written by the developer of GeckoFlag. Information about OpenProject was checked on its official pages on November 9, 2026.

What is OpenProject?

OpenProject is an open-source project management tool that has been in development since 2011. Its license is the GNU GPL v3, and its source code is public on GitHub. It started as a fork of ChiliProject, which itself was a fork of Redmine.

The official introduction describes it as a tool for “both classic and agile project management.” It aims to cover the whole flow of a project in one tool, from initiation and planning to execution and review.

Development is active. As of November 21, 2026, the latest version is 17.9.8 (November 19, 2026).

What OpenProject can do

Here are the main features listed in the official user guide, grouped by purpose.

Purpose Main features
Managing workWork packages (issues, tasks, bugs and more), parent and child relations, filtered lists
PlanningGantt chart, roadmap, calendar, Team planner (schedules per assignee)
AgileBoards (Kanban and others), Backlogs and sprints
Sharing informationWiki, Meetings (agendas and minutes), news, forums, documents
Time and moneyTime tracking, costs, budgets
Integrations with other toolsNextcloud, GitHub, GitLab, OneDrive/SharePoint and more

There are also BIM features for the construction industry (for working with 3D building models), but these are an add-on to the paid editions at extra cost. Some of the features in the table, such as the Team planner and the OneDrive/SharePoint integration, are also paid features. The next section sorts this out.

Because it has so many features, there is also a lot to set up and learn at first. You don’t need to use everything, so it’s a good idea to start with work packages, the Gantt chart and boards.

Community edition vs. paid editions

OpenProject comes in three forms:

  • Community edition: free. You install it on your own server.
  • Enterprise on-premises: a paid edition that you run on your own server.
  • Enterprise cloud: a paid edition where the company behind OpenProject manages the server.

The Enterprise editions include all the features of the Community edition, plus extra features depending on the plan (Enterprise add-ons) and official support.

Plan Price (per user per month, billed yearly) Minimum users Main features added
CommunityFreeNone―
Basic€5.9525Team planner, custom logo and colors, PDF export of the Gantt chart, multiple active sprints and more
Professional€10.9525Single sign-on (SAML, OpenID Connect), OneDrive/SharePoint integration, sharing work packages with external people and more
Premium€15.95100Portfolios, resource management, LDAP user and group sync and more
CorporateOn request250Integration with Nextcloud Hub and openDesk, virus scanning and more

Based on the official pricing page and Enterprise guide as of November 9, 2026. Monthly billing costs €1.00 more per user per month and is available only for Basic in the cloud. The plan contents apply to new subscriptions from May 21, 2025.

The thing to watch is the minimum number of users. For example, even a team of 10 that wants to use the Team planner needs a Basic subscription for 25 users. If your team is small, first check whether the Community edition is enough.

How to install it, and the server you need

How to install it

The method the official guide recommends is Docker. You can run everything in a single container or use Docker Compose. The other method is packages for Linux (.deb/.rpm). The supported Linux distributions are below, 64-bit (AMD64) only.

  • Ubuntu 22.04 (the team says there are no plans to build packages for newer versions such as Ubuntu 24.04)
  • Debian 12 (support for Debian 11 is planned to end in Q3 2026)
  • CentOS/RHEL 9.x
  • SUSE Linux Enterprise Server 15

Windows servers are not officially supported. For large organizations, there is also a way to run it on Kubernetes.

Server guidelines

Number of users CPU Memory Disk
Up to 2004 cores4 GB20 GB
About 5008 cores8 GB40 GB
About 1,50016 cores16 GB80 GB

Based on the official System requirements (as of November 9, 2026).

The officially supported database is PostgreSQL 16 or later. The packages and the single-container Docker setup include PostgreSQL 17.

Neither Docker nor the Linux packages can be used on most ordinary shared hosting. In practice, you prepare a VPS or cloud server and install and update OpenProject on the command line. New versions of OpenProject come out often, so also think about whether someone can keep handling updates, backups and PostgreSQL versions.

Teams it suits, and teams it doesn’t

If your team OpenProject
Wants to plan schedules with a Gantt chart and manage time and budgets in the same toolSuits you
Wants to switch between classic planning and agile work depending on the projectSuits you
Has someone who can prepare a VPS and maintain it with Docker and the command lineSuits you
Wants to keep data in-house and also get paid support (25 users or more)Suits you (Enterprise on-premises)
Only has shared hosting availableDoesn’t suit you
Is a few people who only need Kanban and due datesMay have too many features
Has fewer than 25 users but really needs paid featuresYou pay for 25 users

If you don’t want to run your own server, you can also choose Enterprise cloud. In that case, though, your data is stored in the provider’s cloud.

If you want to compare it with other open-source tools, see also “Comparing Plane and Taiga” and “Project Management Tools You Can Install on Shared Hosting Without Docker.”

For teams that want less server work

Finally, as an option for teams that don’t need as many features as OpenProject and want less server work, let us introduce GeckoFlag, which we develop.

To be upfront: GeckoFlag has no time tracking, no dedicated Scrum features such as sprints, no single sign-on, and no integrations with development or chat tools. If you need these, OpenProject is a better fit.

  • It combines issue tracking (parent and child issues), a Kanban board, a Gantt chart, a wiki and file sharing in one place.
  • It runs on a server with PHP 8.2 or later and MySQL 5.7 or later / MariaDB 10.3 or later. It also works on ordinary shared hosting, with no Docker and no command line needed.
  • It’s a one-time purchase of $30, with no extra cost per user (one license per domain; server costs are separate).

How GeckoFlag differs from open-source tools, including OpenProject, is covered in GeckoFlag vs three open-source tools. You can try the actual screens in the demo.

Summary

OpenProject is an open-source project management tool that covers a Gantt chart, boards, a wiki, meetings, and time and cost tracking. The Community edition is free, and the paid Enterprise edition starts at €5.95 per user per month, with a minimum of 25 users. You install it with Docker or Linux packages, and for up to 200 users the guideline is a server with about 4 CPU cores and 4 GB of memory. It suits teams that want to use a wide range of features and have someone who can maintain a server.

References

Note: all checked on November 9, 2026. Prices, features and requirements may change, so check the official pages for the latest information before you install.