GeckoFlag Blog

Tips for choosing project and issue management tools

Comparing Plane and Taiga: Which Is Better for Scrum? Features, Servers, Pricing and Development Status

Published:

Comparing Plane and Taiga: Which Is Better for Scrum? Features, Servers, Pricing and Development Status

If you look for an open-source project management tool that also works for Scrum, two names come up often: Plane and Taiga. Both are free to use if you install them on your own server.

But the two tools differ a lot, both in what they do well and in how actively they are developed. This article compares Plane and Taiga by features, the server they need, pricing and development status, and sums up which teams each one suits.

Key takeaways

  • Taiga is built around Scrum concepts: user stories, points, a backlog and sprints.
  • Plane offers cycles (sprints) plus a wide range of features, such as modules, pages and a timeline, in a modern interface. It is also actively developed.
  • Both assume a server that can run Docker. The company running Taiga has changed, and a successor called “Tenzu” has appeared, so if you plan to use it for a long time, check its development status too.

Note: this article is written by the developer of GeckoFlag. Information about Plane and Taiga was checked on each tool’s official pages on November 8, 2026.

Conclusion: Taiga to run Scrum as it is, Plane for a wider range of features over the long term

If you want to work with Scrum’s terms and flow as they are, Taiga is a tool where you won’t get lost easily. If, besides sprints, you want to handle groups of work by feature, documents and schedule views in one tool, Plane is a better fit. Plane also has more development momentum right now.

Plane and Taiga at a glance

Item Plane Taiga
LicenseCommunity Edition is AGPL-3.0. Paid features are in the Commercial EditionBackend MPL-2.0, frontend AGPL-3.0
Self-hosting priceCommunity Edition is free (no user limit)Free (no feature limits)
Official cloud priceFree for up to 12 users. Pro is $6 per user per month (billed yearly) / $8 (billed monthly)Monthly fee per plan, regardless of the number of users. Free plan available; Basic is €20 per month
ScrumCycles (sprints), estimates (basic)Backlog, user stories and points, sprints
KanbanYes (board layout)Yes
Gantt chartTimeline layout (dependencies in Pro)None (the team says there are no plans to add one)
DocumentsProject pages (workspace wiki in Pro)Wiki
EpicsProYes
Time trackingProNone
Importing from other toolsJira, Linear, Asana, ClickUp, CSVJira, Trello, GitHub
Server neededDocker. At least 2 CPU cores and 4 GB of memory (8 GB recommended for production)Docker recommended. Several services, such as PostgreSQL and RabbitMQ
Development statusA new version every few months (latest in October 2026)The company running it continues maintenance and small improvements (latest in July 2026). Its successor, Tenzu, is developed by a different team

Sources are listed in the references at the end of this article.

What Taiga is like: built around the Scrum flow

In Taiga, you give user stories points, line them up in the backlog, and assign them to sprints. Scrum’s terms and flow appear on screen as they are, so teams used to Scrum won’t get lost easily. It also has epics, issues (bug reports) and a wiki.

The thing to watch is how it is developed. Since 2024, Taiga has been run by Taiga Cloud Services. Updates are still coming out in 2026, but they are mainly maintenance and small improvements. The rebuilt next version is developed by a different team as “Tenzu,” and it has no sprints yet. This is covered in detail in “What’s Next for Taiga?”

What Plane is like: a wide range of features and active development

In Plane, you organize work by combining cycles (sprints), which divide work by time period, and modules, which group work by goal. You can switch between five layouts (list, board, calendar, table and timeline), and you can also write documents (pages) inside a project.

The thing to watch is how much you can use for free. Epics, time tracking, GitHub and Slack integration, SSO and more start from the paid plans. Also, the Free plan of the official cloud and of the Commercial Edition allows up to 12 users. This is covered in detail in “What to Check Before Self-Hosting Plane.”

Which one to choose

If your team Consider
Wants to keep Scrum’s terms and flow as they are. Estimates with story pointsTaiga
Wants a flat fee for the official cloud, without worrying about the number of usersTaiga
Wants groups of work by feature, documents and schedule views as well as sprintsPlane
Wants a tool that will keep being developed for years to comePlane
Wants epics but doesn’t want to payTaiga (in Plane, epics are in Pro)

Note that both run several services with Docker, so you can’t install them on ordinary shared hosting. You need a server where you can install any software, such as a VPS, and someone who can maintain it.

For teams that don’t need full Scrum

Finally, as an option for teams that don’t need full Scrum and want less server work, let us introduce GeckoFlag, which we develop.

To be upfront: GeckoFlag has no sprints, backlog, story points, epics or modules. If you work with Scrum, Plane or Taiga is a better fit.

  • It combines issue tracking (parent and child issues), a Kanban board, a Gantt chart, a wiki and file sharing in one place.
  • It runs on a server with PHP 8.2 or later and MySQL or MariaDB. It also works on ordinary shared hosting, with no Docker and no command line needed.
  • It’s a one-time purchase of $30, with no extra cost per user (one license per domain; server costs are separate).

How GeckoFlag differs from these tools and OpenProject is covered in GeckoFlag vs three open-source tools. You can try the actual screens in the demo.

Summary

Plane and Taiga are both open-source tools you can use for free if you self-host. Taiga suits teams that want to keep the Scrum flow as it is; Plane suits teams that want a wide range of features beyond sprints and active development. Both assume a server that can run Docker, so also check whether you can take on its maintenance.

References

Note: all checked on November 8, 2026. Prices and features may change, so check the official pages for the latest information before you install.