Before You Migrate from Jira: Exporting to CSV, and What to Decide First

When you move from Jira to another tool, the first thing you want to do is export a CSV. But if you only start thinking about “which field goes where” after exporting, you often end up redoing the import again and again.

What you should decide first is what to move and what not to move. If you also know Jira’s export methods and limits, planning the work becomes easier.

This article covers how to export from Jira Cloud and Jira Data Center and the limits of each, how to decide what to move, how to build a field mapping table, and the migration steps.

Key takeaways

  • Jira Cloud can export up to 10,000 issues at a time from search results to CSV, and Data Center up to 1,000 with the default settings. If you have more, split the export by search conditions.
  • A full site backup of Jira Cloud includes comments and settings, but it isn’t necessarily in a form other tools can read directly. For moving to another tool, CSV is the basic route.
  • Deciding what to move and building a field mapping table before you export means fewer import do-overs.

Note: this article is written by the developer of GeckoFlag. Jira’s features and limits were checked on Atlassian’s official pages on November 9, 2026.

The short answer: decide “what to move” before you export

You can export Jira issues as CSV. There is a limit on how many at a time, but by splitting the export by search conditions you can take out a large number of issues.

The hard part comes after the export. Jira has many features that the new tool may not have, such as sprints, epics, story points, custom fields and automation. If you decide what to move and where each field goes first, the export and import are more likely to need only one pass.

Note that recent versions of Jira Cloud call issues “work items.” In this article, we say “issues” to keep things simple.

How to export Jira issues, and the limits

Jira Cloud: export search results to CSV

After searching for issues, open “More actions” (the … menu) and choose “Export.” There are these kinds of CSV:

  • Export Excel CSV (all fields): exports all of the fields the issues have. This is the one suited to migration.
  • Export Excel CSV (current fields): exports only the fields shown in the list.
  • (filter fields): available when you are using a saved filter.

According to Atlassian, you can export up to 10,000 issues at a time. If you have more, split the export with JQL (Jira’s search conditions) by creation date range, project, issue type, status and so on, then combine the files afterwards. Also check that the total of the split exports matches the count of the original search. The method shared in the past of editing the URL to export 1,000 issues at a time was deprecated in March 2026.

Besides CSV, you can also export to Word or XML. Word includes descriptions and comments, and Atlassian advises exporting about 150 issues at a time. XML includes all fields by default (attachment information is included only if an administrator has enabled attachments).

Jira Cloud: full site backup

Administrators can create and download a backup of the whole site from “Settings → System → Backup manager → Create backup for cloud.” It includes issues and their field values, boards and sprints, users, comments, and settings such as workflows and permissions, and you can choose whether to include attachments.

On the other hand, automation rules and third-party apps and their data are not included. If you include attachments, you have to wait 48 hours before the next backup. This backup isn’t necessarily in a form other tools can read directly. It’s best used as a record you keep before the migration.

Jira Data Center: the default limit is 1,000 issues

Data Center can also export search results with “CSV (All fields)” and “CSV (Current fields).” However, with the default settings, you can export only up to 1,000 issues at a time.

Administrators can change the limit with values such as jira.search.views.default.max in “Administration → System → General configuration → Advanced settings.” Atlassian warns that exporting many issues at once can run out of memory and bring Jira down (it also says this is less likely from Jira 8.2 onwards). Even if you raise the limit, watch the load on the server, and consider it together with splitting the export by search conditions.

Data Center reaches end of life on March 28, 2029. The timeline and the paths you can take are covered in “Jira Data Center Ends in 2029: Four Options for Teams Running Jira on Their Own Servers.”

Item Jira Cloud Jira Data Center
Kinds of CSVAll fields / current fields / filter fieldsAll fields / current fields
Issues per exportUp to 10,000Up to 1,000 by default (administrators can change it)
Over the limitSplit the export with JQL conditionsSplit by conditions, or review the limit value
Full site backupBackup manager (automation and third-party apps not included)(Not covered in this article)

Based on Atlassian’s official guides as of November 9, 2026.

How to decide what to move

The more issues you move, the more checking you have to do. Narrowing things down in this order makes the decision easier.

  1. Projects: projects that are no longer active are kept as an archive, not moved.
  2. Status: whether to move completed issues. If unsure, start with open issues only.
  3. Time period: if you also move completed issues, set a cutoff such as “the last year.”
  4. Issue types: how to represent epics and subtasks in the new tool.
  5. Comments and attachments: if the new tool can’t import them, copy them by hand only for issues in progress, or keep them in the backup or exported files.

Decide at this point where to keep the data you don’t move. Before you cancel Cloud, make sure you have the backup and the CSVs saved locally.

Build a field mapping table

Make a table that lists Jira’s fields one per row, with the field in the new tool that each one goes into. For example:

Jira field What to check in the new tool Example of handling
Issue key (e.g. ABC-123)Are the numbers carried over?If they get new numbers, write the original key in the description
Issue typeCan you create the same types?Combine stories and tasks into “Task”
StatusCan you match the names and number?Merge fine-grained statuses into the closest ones
Assignee / reporterDo users need to be registered first?Match how names are written to the new tool
Epics / parent and childCan you create parent and child issues?Make epics into parent issues
Sprints / story pointsIs there the same feature?If not, don’t move them, or write them in the description
Labels / custom fieldsIs there a field to put them in?Keep only the ones you use often
Comments / attachmentsCan they be imported?If not, copy them by hand only for issues in progress

Building the table makes “features the new tool doesn’t have” clear. Talk as a team about whether your work can run without those features.

Migration steps

1Take stock of how you use Jira today

List the features you use, automation rules, installed apps, integrations with other systems, and the number of issues. Automation and apps don’t move over with CSV, so think about how to replace them in the new tool.

2Decide what to move and build the mapping table

Narrow down the scope using the approach in the previous section, and build the field mapping table. Register statuses, priorities and users in the new tool before importing.

3Try it with a small number of issues

Export and import about 10 issues, and check the fields, dates, garbled characters and parent-child relationships. Reflect any fixes in the mapping table.

4Set the switchover date

Tell the team the switchover date, and stop writing to Jira from that day on. If there is a period when people can write to both, no one will know which one is correct.

5Do the real export and import

Export the latest data and import it. Check that the number of imported issues matches the number exported.

6Decide what to do with the old Jira

Decide whether to keep it read-only for a while, or to keep the backup and CSVs and shut it down. On Cloud, finish downloading before your subscription ends.

If you move to GeckoFlag

As one possible destination, here are some points to note if you move to GeckoFlag, which we develop.

To be upfront: GeckoFlag has no dedicated Scrum features such as sprints, no advanced automation like Jira’s, and no integrations with development tools. If you want to keep using these, another tool will suit you better.

  • There is no migration tool made for Jira. Administrators can import projects and issues from CSV, so you reshape the data exported from Jira into GeckoFlag’s CSV format and import it.
  • Imports only create new issues. Rows that refer to a status, priority or assignee that isn’t registered are skipped, so register them first.
  • Comments can’t be imported. Copy the comments you want to keep on issues in progress by hand, or keep them in the files you exported from Jira.
  • Epic and subtask relationships can be represented with GeckoFlag’s parent and child issues. How much of this an import can reproduce is something to check with a small test.
  • It’s a one-time purchase of $30, with no extra cost per user (one license per domain; server costs are separate).

The import steps are covered in the Import & Export manual, and the differences from Jira in GeckoFlag vs Jira.

Summary

Jira issues can be exported to CSV, up to 10,000 at a time on Cloud and up to 1,000 with the default settings on Data Center. Keep the full site backup as a record, and use CSV as the basic route for moving to another tool. Before exporting, decide what to move and build a field mapping table, try it with a small number of issues, then set a switchover date and do the real migration.