GeckoFlag Blog

Tips for choosing project and issue management tools

Comparing Self-Hosted Kanban Boards: Which Run on Shared Hosting, and Which Need a VPS

Published:

Comparing Self-Hosted Kanban Boards: Which Run on Shared Hosting, and Which Need a VPS

You want to use a Kanban board. But you want to keep your data on your own server. Search for “self-hosted Kanban” and you’ll find plenty of free, open-source tools.

They don’t all run the same way, though. Some run on ordinary shared hosting; others assume a VPS and Docker. That difference changes your costs and the work of installing and maintaining them a great deal.

This article compares four well-known Kanban boards you can run on your own server, by the server they need, price, features and development status.

Key takeaways

  • We compare four tools: Kanboard, WeKan, PLANKA and GeckoFlag.
  • Kanboard and GeckoFlag run on PHP, so you can also install them on shared hosting. WeKan and PLANKA assume a server where you can install any software, such as a VPS.
  • For a light, Kanban-only setup, consider Kanboard. For a modern interface focused on Kanban, PLANKA. If you want a Gantt chart and a wiki in the same tool as your Kanban board, GeckoFlag.

Note: this article is written by the developer of GeckoFlag. Information about the other tools was checked on November 8, 2026.

The first thing to check: “what server does it run on?”

Self-hosted tools may be free software, but the server still costs money and effort. This is where the type of server makes the biggest difference.

  • Shared hosting: the kind of server often used for websites and WordPress. Most offer PHP and MySQL, and the hosting company maintains the server itself. Docker usually isn’t available.
  • VPS: a server where you can install any software. You can run Docker and tools written in languages other than PHP, but you also handle OS updates and security yourselves.

If you already have shared hosting for your website, choosing a tool that runs there adds no new server costs and no extra maintenance. How to compare costs is covered in “Is a One-Time Project Management Tool Really Cheaper?”

The four tools at a glance

Item Kanboard WeKan PLANKA GeckoFlag
Price / licenseFree (MIT)Free (MIT)Community edition is free (Fair Use License). Paid Pro edition for organizations$30 one-time purchase (commercial license)
Runs onPHP 8.1 or later + SQLite / MySQL / PostgreSQL, etc.Node.js (Meteor) + MongoDB or FerretDBNode.js + PostgreSQLPHP 8.2 or later + MySQL / MariaDB
Shared hostingCan be installed, but the official FAQ advises against shared hostingNo (Snap, Docker, bundle, etc.; assumes a VPS or similar)No (Docker strongly recommended; assumes a VPS or similar)Yes (designed to be used on shared hosting)
InstallationExtract the ZIP and set write permissionsSnap, Docker, etc.Docker (manual installation also possible)Upload the files and set up with a browser-based installer
Main featuresKanban, subtasks, swimlanes, automatic actions, time trackingKanban (collaborative editing)Kanban (real-time collaborative editing). Roles, guests, SSO and more in the Pro editionIssues, parent and child issues, Kanban, Gantt chart, wiki, file sharing
Development statusMaintenance mode (no major new features in development)Actively developed. Only the latest version is supportedActively developed by the company behind itActively developed by its developer

Sources are listed in the references at the end of this article.

What each tool is like, and which teams it suits

1Kanboard: light and focused on Kanban

Kanboard is an open-source tool focused on the Kanban method. It has a full set of Kanban features, such as swimlanes and automatic actions. It runs on PHP and uses SQLite as its default database, so installation is very light.

Two things to note: the official FAQ doesn’t recommend shared hosting, and development is in maintenance mode. It suits small teams for whom Kanban alone is enough. How to install it on shared hosting is covered in detail in “Project Management Tools You Can Install on Shared Hosting Without Docker.”

2WeKan: free, open source, with many ways to install

WeKan is an open-source Kanban board under the MIT license. It offers several ways to install it, including Snap for Linux and Docker.

The official README gives at least 1 GB of free memory as a guide, and at least 4 GB in total for a production server. Only the latest version is supported, so keeping automatic updates on is recommended. It suits teams with someone who can manage a VPS.

3PLANKA: a modern interface focused on Kanban

PLANKA is a Kanban board with real-time collaborative editing. Its interface is clean, and it supports more than 35 languages.

The official site presents the free Community edition as being for individuals, clubs and home servers. For organizations, there’s a paid Pro edition with roles, guest invitations, single sign-on and more. Docker is strongly recommended for installation, and it assumes a VPS or similar.

4GeckoFlag: a Gantt chart and a wiki alongside Kanban

GeckoFlag, which we develop, brings together not only a Kanban board but also issue tracking (parent and child issues), a Gantt chart, a wiki and file sharing in one tool. It runs on PHP and is built to be used on ordinary shared hosting.

  • You install it with a browser-based installer, and to update it you just upload a ZIP in the admin screen. No Composer, no Docker and no command line needed.
  • On the Kanban board, you can drag cards on a PC to change their status.
  • The interface is available in 15 languages, and each user can switch. You can invite outside people as guests, only to the projects they join.
  • It’s a one-time purchase of $30, with no extra cost per user.

On the other hand, it isn’t free, and it isn’t open source. If you value detailed Kanban-specific features such as swimlanes and automatic actions, Kanboard is a better fit.

How to choose

If your team Consider
Only needs Kanban. One person or a few, and wants it freeKanboard
Has someone who can manage a VPS. Prefers free, open-source softwareWeKan, Kanboard
Wants a modern interface focused on Kanban. As an organization, can consider a paid editionPLANKA
Wants to use its current shared hosting. Wants a Gantt chart and a wiki as well as Kanban. Includes non-engineers or outside peopleGeckoFlag

How GeckoFlag differs from open-source tools that go beyond Kanban, with Gantt charts and sprints (Plane, OpenProject, Taiga), is covered in GeckoFlag vs three open-source tools. You can try GeckoFlag’s actual screens in the demo.

Summary

When choosing a Kanban board that runs on your own server, check “what server does it run on?” before features. Kanboard and GeckoFlag, built on PHP, run on shared hosting; WeKan and PLANKA assume a VPS or similar. Then choose based on whether Kanban alone is enough or you want a Gantt chart and a wiki in the same tool, and you’ll find the tool that fits your team more easily.

References

Note: each tool’s details are as of the date given above. Check the official pages for the latest information before you install.