Before You Upgrade to Redmine 7.0: Checking Ruby, Plugins and Themes

Published:

Before You Upgrade to Redmine 7.0: Checking Ruby, Plugins and Themes

Redmine 7.0 is a major update that includes a move to Rails 8.1 and the addition of webhooks. The new features are attractive, but when you upgrade from an older version, you can run into trouble with the Ruby version or with plugin support.

This article sums up what changed in Redmine 7.0, what to check before you upgrade, and what to prepare before the work. It leaves the detailed commands to the official guide and focuses on what you should know before you start.

Key takeaways

  • Redmine 7.0 needs Ruby 3.2 to 4.0. Support for Ruby 3.2 has already ended, so if you upgrade Ruby, Ruby 3.3 or later is recommended.
  • The usual stumbling blocks are plugins and themes. With the move to Rails 8.1 and some replaced components, some won’t work as they are.
  • Before the work, take a backup, try the upgrade in a test environment, and check whether your plugins support 7.0.

Note: this article is written by the developer of GeckoFlag. Redmine’s requirements and steps were checked against the official guides on November 5, 2026.

The short answer: check “the Ruby version” and “plugin support” before you upgrade

Updating Redmine itself usually goes smoothly if you follow the official steps. The trouble is in what surrounds it. Does your server’s Ruby meet the requirements? Do the plugins and themes you use support 7.0? Check these two first, and you’ll greatly reduce the chance of “it doesn’t work” on the day of the upgrade.

What changed in Redmine 7.0

According to the official announcement, the main changes are as follows.

  • Move to Rails 8.1: the framework Redmine is built on has been updated. Ruby 4.0 is also supported.
  • Webhooks: Redmine can now send notifications to outside services when, for example, an issue is updated. They are disabled by default, and an administrator turns them on.
  • Refreshed interface: the header and navigation have a new design.
  • Previews: you can now view Word and LibreOffice Writer files, PDFs and more directly on screen.
  • Security: “sudo mode,” which asks for your password again before important actions, is now enabled by default.

What you need to do depends on your current version

First, check which version of Redmine you’re running. You can find it under “Information” in the administration screen.

Redmine Status Supported Ruby
7.0Stable (latest)3.2, 3.3, 3.4, 4.0
6.1Stable3.2, 3.3, 3.4
6.0Legacy stable3.1, 3.2, 3.3
5.1End of life2.7, 3.0, 3.1, 3.2

If you’re on 5.1 or earlier, you’ll need a big jump not only in Redmine but also in Ruby. When you skip several versions at once, always try it in a test environment before production.

Ruby has support deadlines too. Support for Ruby 3.2 ended on April 1, 2026, and 3.3 is scheduled to end at the end of March 2027. It has been decided that the next Redmine release (7.1) will drop support for Ruby 3.2. If you’re upgrading Ruby now, choose 3.4 or 4.0, and it will last until the next update. Note that Ruby 4.0.0 to 4.0.3 have a problem that slows down wiki rendering, and the official guide recommends 4.0.4 or later.

Common stumbling blocks

1The server’s Ruby doesn’t meet the requirements

Redmine 7.0 needs Ruby 3.2 or later. If the Ruby on your server is older, you’ll first need to upgrade Ruby. On shared hosting, the standard Ruby is often old, and users often can’t upgrade it (covered in detail in “Can You Install Redmine on Shared Hosting?”).

2Plugins stop working

With the move to Rails 8.1 and some components Redmine used being replaced, some plugins won’t work as they are. For each plugin, check whether its author has released a version that supports 7.0. For plugins that are no longer updated, decide whether to keep using them, look for a replacement or stop using them.

3Themes look broken

In 7.0, the old CSS for icons was removed from Redmine itself. With older themes, icons may no longer appear. A compatibility CSS file (legacy-icons-compat.css) is provided, so you can use it to fill the gap while you wait for the theme’s author to update it.

4The database version

For 7.0, the recommended versions include MySQL 8.0 to 8.4 and PostgreSQL 14. If your database is also old, plan to upgrade it at the same time.

5Your own changes

If you’ve edited Redmine’s own files directly, the update may overwrite them or break them. Keep a list of what you changed, so you can apply it again after the update.

What to prepare before the work

  1. Check the requirements: whether your Ruby, database and server meet the 7.0 requirements.
  2. Back up: the database and attachments (the files folder). The official guide also recommends a backup before you start.
  3. List your plugins and themes: what you have installed, and whether each one supports 7.0.
  4. Try it in a test environment: upgrade a copy of production once, and check the screens and main tasks.
  5. Tell your users: decide how long Redmine will be unavailable during the work, and how to roll back if something goes wrong.
  6. Check permissions after the update: when new features are added, check under “Roles and permissions” who should be allowed to use them.

The upgrade at a glance

In plain words, the official guide’s flow is as follows. Always check the actual commands in the official steps (RedmineUpgrade).

  1. Extract the files of the new version into a separate folder
  2. Move the database configuration file, the attachments, and the plugins and themes you installed yourself into the new folder
  3. Install the required libraries again
  4. Update the database for the new version (including for plugins)
  5. Clear the cache and restart the application

Every step assumes command-line work. How long it takes depends greatly on whether someone in your company can handle the server.

The option of not doing it yourself

Upgrading doesn’t end with 7.0. Both Redmine and the Ruby it runs on need the same work every few years. If that work feels heavy each time, there are other paths.

  • Leave it to a Redmine cloud service: the provider manages and updates the server. In exchange, you pay a monthly fee.
  • Review whether you really use Redmine’s features: if you only use a few of them, a tool with less upkeep may be enough. How to review this is covered in “Do You Really Need Redmine’s Features?”

How GeckoFlag handles it

GeckoFlag, which we develop, is a self-hosted tool that runs on PHP. Many of Redmine’s features, such as time tracking, custom fields, workflows and plugins, are not in it. Instead, we focus on keeping the work of running it small.

  • To update, you just upload a ZIP in the admin screen, with no command-line work. It takes a backup automatically before applying the update.
  • It runs on a server with PHP 8.2 or later and MySQL or MariaDB, including ordinary shared hosting.
  • It’s a one-time purchase of $30, and future updates are free.

The differences from Redmine are covered in GeckoFlag vs Redmine, and you can try the actual screens in the demo.

Summary

When upgrading to Redmine 7.0, the trouble tends to come from what surrounds Redmine rather than from Redmine itself. First check that your server’s Ruby meets the requirements and that your plugins and themes support 7.0. Then take a backup and try it in a test environment before going to production. Ruby has support deadlines too, so if you upgrade it, 3.4 or 4.0 is the safe choice.